Currently Onsite: Progress continues with exterior weatherproofing, which includes applying sheathing and the roof membrane, along with installation of exterior windows and doors. Each condo's interior framing has continued, as well as the roughing in of mechanical, plumbing, electrical and fire suppression systems.
The commercial spaces on the main level have taken shape and are being advertised for sale or lease. If you know someone who might be interested, please reach out to Jared Goodman with Cushman Wakefield, (970) 267-7723 or Hilary Dehn with Dehn Real Estate, (720) 261-8606. Up Next: Ceilings will be built (see photo for reference), interior walls will be framed and drywall will go up. Then, can lights can be hung!